This chapter provides an overview of the vendor rebate claims management business process and discusses how to:
Generate vendor rebate claims.
Print a vendor rebate claim.
Notify rebate managers of claims.
Use the claims management workbench.
Reconcile payments for vendor rebates.
Maintain claims.
Reconcile claims.
Notify settlement manager.
View claim settlement information.
Enter claim payments manually.
PeopleSoft Purchasing provides the capability to manage the complete life cycle of a vendor rebate claim. Using PeopleSoft Purchasing vendor rebate functionality you can generate claims, send a formal claim to the supplier, inform PeopleSoft Payables and PeopleSoft Receivables of the accrued rebate amount and expected payment from the supplier, reconcile payments from the supplier with the claim, and finally at any time during this claim processing notify the rebate manager or settlement manager of the claim activity that is occurring.
To assist with the management of vendor rebate claims and the payment for those claims PeopleSoft Purchasing developed the claims management workbench. The claims management workbench is a part of the vendor rebate functionality. Using the claims management workbench you can perform several process actions against the claim. A few of the processes that you can initiate from the claims management workbench can also be initiated from other pages that can be reached directly from the Vendor Rebates menu in PeopleSoft Purchasing. Depending on the security settings in the environment you may choose to initiate the processes from the claims management workbench or from an individual run control page.
When using the claims management workbench you can perform several processes. Basically you select the process you would like to perform using the workbench and then click the Submit For Processing button. When you click this button the Claims Management Workbench - Process Request Option page appears. After specifying the process options you click the OK button. This page initiates the Process Vendor Claims Application Engine process (PO_PRCSCLAIM) or the Vendor Rebate Claim Print SQR Report process (PORB7010). The Process Vendor Claims process has the capability to view the action that was requested and initiate the additional necessary processes. The Process Vendor Claims process can initiate these processes:
Defer Claim Application Engine process (PO_CLMDEFER).
Cancel Claim Application Engine process (PO_CLMCANCEL).
Claim Settlement Process for AP (claim settlement process for account payables) Application Engine process (PO_CLMSETTLE_AP).
Claim Settlement Process for AR (claim settlement process for account receivables) Application Engine process (PO_CLMSETTLE_AR).
Claims Reconciliation Application Engine process (PO_CLMRECON).
Claim Overdue Deduction Application Engine process (PO_CLMDEDUCT).
Claim Cancel Deduction Application Engine process (PO_CLMCANDED).
This diagram depicts the vendor rebate claims management process flow using the claims management workbench:
Vendor rebate claims management process flow
To process a vendor rebate claim:
Note. The vendor rebate claims process becomes available after you create a vendor rebate agreement, associate that vendor rebate agreement with a purchase order, and perform transactions (receipts, vouchers, and return to vendors) related to that purchase order that is associated with a vendor rebate agreement. Also, a claim will be generated for a rebate agreement only if the next claims generation date is reached.
Initiate the Generate Rebate Accrual Application Engine process (PO_VRBTACCR).
The rebate accrual records serve as the basis for claim generation.
Initiate the Generate Vendor Rebate Claims Application Engine process (PO_GENCLAIM).
This process generates the vendor rebate claims.
(Optional) Initiate the Notify Rebate Manager Application Engine process (PO_VRBT_NTFY).
This process notifies the particular rebate manager of claims that were created for all vendor rebate agreements, a specific vendor rebate agreement, or a specific claim.
Approve the claim using the Claims Management Workbench - Rebate Claims page.
Using the Apply Claim Action or Claim Status Action fields on this page you can approve, unapprove, or cancel a claim.
(Optional) Defer a claim to the next period using the Claims Management Workbench - Rebate Claims page.
Select Defer in the Apply Claim Action or Claim Status Action fields.
Click the Submit for Processing button to initiate the Process Vendor Claims process. This process then initiates the Defer Claim process.
Perform a specific process action for the claim using the Claims Management Workbench - Rebate Claims page.
Using the Apply Process Action or Claim Processing Action fields you can select the process you want to initiate for the claims and then click the Submit For Processing button. The Submit For Processing button initiates the process you selected to perform in the processing action field. Using these fields you can:
Select a process action of Claim Settlement to initiate the Process Vendor Claims process. This process then initiates the Claim Settlement Process for AP or the Claim Settlement Process for AR.
These processes send expected payment from the supplier to PeopleSoft Payables in the form of an adjustment voucher if the Settlement Method on the vendor rebate agreement is Adjustment Voucher or to PeopleSoft Receivables as a pending item if the Settlement Method on the vendor rebate agreement is Check, Credit Memo, Direct Debit, Draft, or Electronic Funds Transfer (EFT).
Select a process action of Print for Dispatch to initiate the Vendor Rebate Claims Print process.
This process generates a hard copy of the claim. The rebate manager can then send this claim report to the supplier.
Select a process action of Payment Reconciliation to initiate the Process Vendor Claims process. This process then initiates the Claim Reconciliation process.
This process reconciles the claim with incoming payments from PeopleSoft Payables and PeopleSoft Receivables.
Select a process action of Overdue to initiate the Process Vendor Claims process. This process then initiates the Claim Overdue Deduction process.
This process will reverse the pending items that were previously sent to PeopleSoft Receivables and then it will generate adjustment vouchers to send to PeopleSoft Payables.
Select a process action of Cancel Deduction to initiate the Process Vendor Claims process. This process then initiates the Claim Cancel Deduction process.
This process will reverse the adjustment vouchers (for overdue) previously sent to PeopleSoft Payables and then it will regenerate the pending items to send back to PeopleSoft Receivables—once again you are expecting to receive payment from the supplier.
(Optional) Save this workbench using the Claims Management Workbench - Rebate Claims page.
Click the Save For Later button.
Perform the PeopleSoft Payables vendor rebate claim processing flow for adjustment vouchers.
See The PeopleSoft Payables Vendor Rebate Claim Processing flow section in this chapter.
Perform the PeopleSoft Receivables vendor rebate claim processing flow for pending items.
See The PeopleSoft Receivables Vendor Rebate Claim Processing flow section in this chapter.
(Optional) Initiate the Notify Settlement Manager Application Engine process (PO_VRBT_NTFY).
This process notifies the particular settlement manager of claim settlement activity that was created for all vendor rebate agreements, a specific vendor rebate agreement, or a specific claim.
View the results from all the claim and payment activity associated with vendor rebate claim using the Claims Management Workbench - Rebate Claims page.
The Claims Management Workbench - Rebate Claims page contains four different tabs where you can view information and current amounts for vendor rebate claims, claim settlement, claim reconciliation, and value added tax (VAT) details.
(Optional) View claim settlement results associated with a vendor rebate claim using the Claim Settlement inquiry page.
Note. If the rebate manager does not have unrestricted access then they can only select vendor rebate agreements assigned to them on any pages that reference the rebate agreement.
See Defining Vendor Rebate Agreement Authorization.
Warning! The claims management functionality in PeopleSoft Purchasing is the driver and central location for all PeopleSoft Payables and PeopleSoft Receivables transactions sourced for claims. You should not manually modify these claims transactions in PeopleSoft Payables or PeopleSoft Receivables because this could cause an out-of-sync situation between PeopleSoft Purchasing and the other applications.
PeopleSoft Payables Vendor Rebate Claim Processing Flow
Before you can process claims in PeopleSoft Payables you must have first run the Claim Settlement Process for AP using the Claims Management Workbench - Rebate Claims page. Select a process action of Claim Settlement.
To process an adjustment voucher (expected payment) in PeopleSoft Payables:
Build the adjustment vouchers that came from the vendor rebate claim processing in PeopleSoft Purchasing to PeopleSoft Payables by initiating the Voucher Build Application Engine process (AP_VCHRBLD) using the Voucher Build page.
This process also writes the voucher information to the Incoming Payment tables for Claims Management in PeopleSoft Purchasing.
See Understanding Voucher Build Processing.
See Understanding Voucher Build Source Transactions.
See Running the Voucher Build Process and Reviewing Messages.
Initiate the Claim Reconciliation process using the Claims Management Workbench - Rebate Claims page.
Select a process action of Payment Reconciliation.
This process looks at the Incoming Payment tables and reconciles the expected amount on a claim with how much was received for the claim.
Note. To adjust the claim amounts use the Claims Management Workbench in PeopleSoft Purchasing before running the Claim Settlement Process. Do not adjust claim amounts in PeopleSoft Payables.
PeopleSoft Receivables Vendor Rebate Claim Processing Flow
In PeopleSoft Receivables there are two different processes that can occur when integrating with PeopleSoft Purchasing for vendor rebate agreements. One process is for PeopleSoft Receivables to process a vendor rebate claim with a settlement method of credit memo. The other process is to process a vendor rebate claim with a settlement method of cash (check, direct debit, draft or EFT).
Before you can process claims in PeopleSoft Receivables you must have first run the Claim Settlement Process for AR using the Claims Management Workbench - Rebate Claims page. Select a process action of Claim Settlement.
To process a pending item (expected payment) in PeopleSoft Receivables (cash settlement method):
Post the pending items that came from the vendor rebate claim processing in PeopleSoft Purchasing to PeopleSoft Receivables by initiating the Receivables Update Multiprocess job (ARUPDATE) using the Receivable Update Request page.
See Purchasing and Order Management Interface.
See Setting Up Receivable Update and Pending Group Generator.
If the rebate claim is reversed, use the maintenance worksheet to offset the original claim item (this process is the same as offsetting any other item).
Enter the cash settlement payment as a deposit in PeopleSoft Receivables to record the payment.
See Entering Payments.
Apply payments received for vendor rebate claims using the payment worksheet.
You must manually apply the payments on the payment worksheet to indicate the base and value-added tax (VAT) amounts if any for each item.
Initiate the Receivables Update process (ARUPDATE) using the Receivables Update Request page to post the payments for a vendor rebate claim.
See Setting Up Receivable Update and Pending Group Generator.
Initiate the AR Rebate Notification Application Engine process (AR_REBATE) process using the Receivables Rebate Notification page to interface the payment information or any other change to the balance of a claim item to the Claims Incoming Payment staging table (VRBT_CLAIM_PMTI). This enables users to reconcile the payments with the original claims using the claims management workbench. This process also updates the claim balances in the claims management workbench based on payment and maintenance activity in PeopleSoft Receivables.
Initiate the Claim Reconciliation process using the Claims Management Workbench - Rebate Claims page.
Select a process action of Payment Reconciliation.
This process looks at the Incoming Payment tables and reconciles the expected amount on a claim with how much was received for the claim.
It also creates a Claim Voucher with the collected amounts (VAT, claim amount, and so on).
Note. The claim voucher created here will not be processed by the PeopleSoft Payables pay cycle.
Process the claim voucher through PeopleSoft Payables using the Voucher Build process.
See The PeopleSoft Payables Vendor Rebate Claim Processing Flow section in this chapter.
To process a pending item (expected payment) in PeopleSoft Receivables (credit memo settlement method):
Post the pending items that came from the vendor rebate claim processing in PeopleSoft Purchasing to PeopleSoft Receivables by initiating the Receivables Update Multiprocess job (ARUPDATE) using the Receivable Update Request page.
See Purchasing and Order Management Interface.
See Setting Up Receivable Update and Pending Group Generator.
Initiate the Receivables Update process (ARUPDATE) using the Receivables Update Request page to post the payments for a vendor rebate claim.
This process posts the credit memo information for the claim to the Incoming Payment tables for Claims Management in PeopleSoft Purchasing.
See Setting Up Receivable Update and Pending Group Generator.
Enter the credit memo as a deposit in PeopleSoft Receivables as an AR item.
See Entering Payments.
Apply credit memo received for vendor rebate claims using the maintenance worksheet.
You must manually apply the credit memo payments on the maintenance worksheet to indicate the base and value-added tax (VAT) amounts if any for each item.
Initiate the Receivables Update process (ARUPDATE) using the Receivables Update Request page to post the payments for a vendor rebate claim.
See Setting Up Receivable Update and Pending Group Generator.
Initiate the AR Rebate Notification Application Engine process (AR_REBATE) process using the Receivables Rebate Notification page to interface the payment information or any other change to the balance of a claim item to the Claims Incoming Payment staging table (VRBT_CLAIM_PMTI).
This enables users to reconcile the payments with the original claims using the claims management workbench. This process also updates the claim balances in the claims management workbench based on payment and maintenance activity in PeopleSoft Receivables.
Initiate the Claim Reconciliation process using the Claims Management Workbench - Rebate Claims page.
Select a process action of Payment Reconciliation.
This process looks at the Incoming Payment tables and reconciles the expected amount on a claim with how much was received for the claim.
It also creates a Claim Voucher with the collected amounts.
Note. The claim voucher created here is just a regular adjustment voucher.
Process the claim voucher through PeopleSoft Payables using the Voucher Build process.
See The PeopleSoft Payables Vendor Rebate Claim Processing Flow section in this chapter.
Before you begin working with vendor rebate claims, you should:
Set up entry types and reasons if you are integrating with PeopleSoft Receivables.
Set up group types and group origins if you are integrating with PeopleSoft Receivables.
You must define a group type of R for vendor rebates.
Define vendor rebate PeopleSoft Receivables options for each accounts receivable business unit and claim type using the AR BU Options page.
See Defining Account Receivables Integration Options for Vendor Rebates.
This section discusses how to generate vendor rebate claims.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_GEN_CLM_RC |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Generate Claims, Generate Claims |
Initiate the Generate Vendor Rebate Claims process. |
Access the Generate Claims page.
Through Date |
Select the date through which you want to generate claims. |
Claim Run Options |
Select the run option. Values are:
|
This section discusses how to print a vendor rebate claim.
Note. The Vendor Rebate Claims Print page is used to initiate the Vendor Rebate Claims Print process outside of the claims management workbench. You can also initiate the Vendor Rebate Claims Print process directly from the Claims Management Workbench - Claim Details page.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIMS_PRT_RC |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Vendor Rebate Claims Print, Vendor Rebate Claims Print |
Initiate the Vendor Rebate Claims Print process. |
This section discusses how to notify rebate managers of claims.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_NTFY_RM_RC |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Notify Rebate Manager, Notify Rebate Mgr |
Initiate the Notify Rebate Manager process. |
Access the Notify Rebate Mgr page.
Notification Option |
Select the notification option. Values are:
|
This section provides an overview of the claims management workbench and discusses how to use the claims management workbench.
The rebate manager can use the claims management workbench after a rebate claim has been generated by the Generate Vendor Rebate Claims process. The rebate manager can use the claims management workbench to:
Review, approve, and generate a formal rebate claim to send to the supplier.
Settle claims by sending the expected rebate claim payment to PeopleSoft Payables or to PeopleSoft Receivables.
Reconcile incoming payments and reconcile payments with a claim ID.
In addition to the rebate claim life cycle, the claims management workbench will enable the rebate manager to handle outstanding situations like deferring a claim to the next payment cycle, or creating a deduction or reversing a deduction created in the next period to address overdue payments from the supplier.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIM_WB |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Claims Management Workbench, Claims Management Workbench - Rebate Claims |
Maintain vendor rebate claims. |
|
VRBT_CLAIM_DETAIL |
Click the Claim ID link in the Claims group box on the Claims Management Workbench - Rebate Claims page. |
View all the detail information for a claim. |
|
VRBT_CLAIM_SETTLE |
Click the Claim Settlement link in the Claims group box on the Claims Management Workbench - Rebate Claims page. |
View claim settlement information. |
|
VRBT_CLAIM_RECON |
Click the Reconciliation Status link in the Claims group box on the Claims Management Workbench - Rebate Claims page. |
View claim reconciliation details. |
|
VRBT_CLAIM_WB_PRCS |
Click the Submit for Processing button on the Claims Management Workbench - Rebate Claims page. |
Initiates the Process Vendor Claims process or the Vendor Rebate Claim Print process. This Process Vendor Claims process will perform the action that was requested in the Apply Processing Action or the Claim Processing Action fields on the Claims Management Workbench - Rebate Claims page. |
Access the Claims Management Workbench - Rebate Claims page.
Before you access this page you will enter the Workbench ID on the Claims Management Workbench dialog box.
Description |
Enter a description for the claims management workbench. |
Claims Search Criteria
Overdue Status |
Select this check box if you want to work with claims that are overdue. The Overdue Status check box is selected on the claim. |
Claim Due Date |
Select a claim due date. The system will display all claims where the claim due date is less than or equal to the date specified. |
Claims Past Due |
Select this check box if you want to work with claims that are past due. The system looks at the claim due date entered to determine what is past due. |
Get Claims |
After you select the claim search criteria, click this button to have the system display in the Claims group box all of the claims that match the search criteria selected. |
Applies to Selected Rows
Apply Claim Action |
Select the claim action you want to apply to all the claim rows you select in the Claims group box. Claim actions are:
Using this field you can apply the claim action you select to multiple claims. To apply a claim action to an individual claim row select the claim action using the Claim Status Action field in the Claims group box. |
Apply Process Action |
Select the process action you want to apply to all the claim rows you select in the Claims group box. Process actions are:
Using this field you can apply the claim action you select to multiple claims. To apply a claim action to an individual claim row select the claim action using the Claim Processing Action field in the Claims group box. |
Rebate Claims
Select |
This check box next to each claim row is used in conjunction with the Apply Claim Action, Claim Status Action, Apply Process Action, and the Claim Processing Action fields. Select the claims you want to apply the claim action or process action to. |
Claim Status Action |
Select a status action for an individual claim. Claim status action values are the same as those for the Apply Claim Action field. Claim status actions are:
|
Claim Processing Action |
Select a claim processing action for an individual claim. Claim processing action values are the same as those for the Apply Process Action field. Claim processing actions are:
|
Claim ID |
Displays the claim ID. Click the claim ID link to access the Claim - Details page. Using this page you can view all the detail information associated with the claim. |
Claim Status |
Displays the header status for the claim. |
Claim Date |
Displays the claim date from the claim header. |
|
Click the Claim Processing Error button to view the error message associated with the last claim processing action performed on the claim. This button appears only if an error has occurred. |
|
The In Process button appears on the page when a process you submitted is being executed by the system. This button appears only if a process is currently running. Plus, the Claim Status Action and Claim Processing Action fields are not available for entry until the requested processing action has completed and this button no longer appears. |
Settlement
Select the Settlement tab.
Total Claim Amount |
Displays the total claim amount in the vendor rebate agreement currency from the claim header. |
Total Claim Collected |
Displays the total claim amount collected in the vendor rebate agreement currency from the claim header. |
Claim Amount Not Collected |
Displays the claim amount available for collection in the vendor rebate agreement currency from the claim header. |
Settlement Method |
Displays the settlement method for the claim. |
Claim Settlement |
Click this link to access the Claim Settlement inquiry page. Using this page you can view the details of the settlement. |
Reconcile
Select the Reconcile tab.
Recon Status (reconciliation status) |
Click this link to access the Claim Reconciliation - Claim Details page. Using this page you can view all the claim reconciliation details. |
Defer Claim |
Displays the deferred claim ID. If the claim ID has been deferred and already included in a new and subsequent Claim ID, the new claim ID is displayed here for reference. Click this link to access the Claim - Details page. Using this page you can view the claim details for the deferred claim. |
VAT Details (value added tax details)
Select the VAT Details tab.
Total Claim VAT |
Displays the total claim VAT amount in the vendor rebate agreement currency for the claim header. |
VAT Collected |
Displays the total claim VAT amount collected in the vendor rebate agreement currency for the claim header. |
VAT Amount Not Collected |
Displays the total claim VAT amount available for collection in the vendor rebate agreement currency for the claim header. |
Miscellaneous Information
Save For Later |
Click this button to save this claims management workbench and its associated information. At a later date you can retrieve the workbench and continue maintaining the claim information. |
Refresh |
Click this button to have the system refresh the information that displays on this page. |
Override Accounting Date |
(Optional) Select an override accounting date to be used by the claim processing action. This date will override the claims accounting date that appears in the claim header. |
Submit For Processing |
Click this button to initiate the process selected in either the Apply Process Action or Claim Processing Action field for one or more vendor rebate claims. When you click this button the Claims Management Workbench - Process Request Options page appears. Use this page to specify request options and then initiate the selected process. |
This section discusses how to reconcile payments for vendor rebates.
Note. The Payment Reconcile page is used to initiate the payment reconciliation process outside of the claims management workbench. You can also initiate the payment reconciliation process directly from the Claims Management Workbench - Claim Details page.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_PYMT_RECON_RC |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Incoming Payment Reconcile, Payment Reconcile |
Initiate the Payment Reconcile Application Engine process (PO_CLMRECON). |
Access the Payment Reconcile page.
Incoming Payment Recon Option (incoming payment reconciliation option) |
Select the reconciliation option. Values are:
Note. If you do not have unrestricted access then you will only be able to select the claim IDs and rebate IDs that apply to your user ID. If you have unrestricted access you can select any claim ID or rebate ID regardless of user ID. |
Accounting Date |
(Optional) Select an accounting date you wish to apply for this incoming payment reconciliation process. This date will override the vendor rebate agreement accounting date. |
This section provides an overview of the claim amount change processing and discusses how to:
Maintain claims.
Maintain claim distributions.
Using the Claim - Details page you can modify, namely increasing or decreasing, the claim amount on a vendor rebate claim. To change the claim amount the claim status must be Open, Approved, Deferred, Pending Payment, Partially Paid (if the related active claim settlement is on hold), or Paid.
This table depicts the processing that occurs when a claim amount is changed:
Claim Status |
Action |
System Processing That Occurs |
Open, Approved, or Deferred |
Change the claim amount. |
|
Pending Payment (Claim settlement already sent to PeopleSoft Payables or PeopleSoft Receivables) |
Change the claim amount. |
|
Partially Paid and active claim settlement on hold. (Claim settlement has not been sent to PeopleSoft Payables or PeopleSoft Receivables) |
Change the claim amount. |
Note. The new total claim amount cannot be less than the total claim collected amount. |
Paid (Claim settlement is complete) |
Change the claim amount. |
Note. The new total claim amount cannot be less than the total claim collected amount. |
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIM_DETAIL |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Claim Details, Claim - Details |
Maintain vendor rebate agreement claims. |
|
VRBT_CLAIM_ACT_SEC |
Click the Activities link on the Claim - Details page. |
Maintain claim activities. |
|
VRBT_CLAIM_DIST |
|
View claim detail distribution information and update claim distribution ChartFields. |
Access the Claim - Details page.
Header
Claim Date |
Displays the claim date. You can modify this claim date if the claim status is Open or Approved. If you change the claim date the system will recalculate the claim due date and will display a message asking if you want to accept the new claim due date. |
Claim Due Date |
Displays the claim due date. You can modify this claim due date if the claim status is Open or Approved. |
Accounting Date |
Displays the accounting date used for this claim. You can modify this accounting date for a claim in any status. If you modify the accounting date the system validates that the accounting date is defined in an open period for the claim. |
Settlement Method |
Displays the settlement method for the claim. You can modify this claim due date if the claim status is Open or Approved. If you modify the settlement method, you must enter the accounts receivable payment terms or the accounts payable payment terms or both depending on the settlement method. Enter the payments terms using the AR Payment Terms (accounts receivable payment terms) or AP Payment Terms (accounts payable payment terms) fields. |
Remit From Customer |
Displays the remit from customer associated with the customer and vendor on the claim. This is the customer that will send the payment for the claim. |
Settlement Tolerances
The settlement tolerance fields appear by default from the vendor rebate agreement. You can override the tolerance settings if you choose.
Amount Summary
Total Claim Amount and Currency |
Displays the total claim amount in the vendor rebate agreement currency. |
Total Claim Collected |
Displays the total claim collected amount in the vendor rebate agreement currency. |
Total Claim VAT Amount (total claim value added tax amount) |
Displays the total claim VAT amount in the vendor rebate agreement currency. This field will appear if you are using VAT functionality. |
VAT Collected (value added tax collected) |
Displays the VAT collected amount in the vendor rebate agreement currency. This field will appear if you are using VAT functionality. |
Comments and Messages
Comments |
Enter claim comments. These comments will appear on the Vendor Rebate Claims Print report. |
Message |
Displays the error message received from any of the batch processes run against the claim. This field will not appear if there are no messages. |
Activities
Activities |
Click this link to access the Claim - Activities page. Use the page to manage the claim activities. |
Lines
Line |
Displays the claim line. |
Defer Claim |
Displays the deferred from claim. |
Rebate Type |
Displays the rebate rule type. |
Claim Amount and Currency |
Displays the claim amount in the vendor rebate agreement currency. You can modify the claim amount if the claim status is: Open, Approved, Deferred, Pending Payment, Partially Paid (if the related active claim settlement is on hold), or Paid. |
VAT Amount (value added tax amount) |
Displays the VAT amount in the vendor rebate agreement currency. |
Reason Code |
Enter a reason code if you modify the claim amount. |
|
Click the Distribution button to access the Claim - Distributions page. Use this page to view claim detail distribution information and to update claim distribution ChartFields. |
Access the Claim - Distributions page.
Line |
Displays the distribution line number. |
Percent |
Displays the distribution percent of the line amount. |
ChartFields
Select the ChartFields tab.
Type |
Displays the distribution type. VR Agrmnt.appears for vendor rebate agreement claims. |
ChartFields |
Displays the ChartFields associated with the claim distribution. You can modify the ChartFields if the claim status is Open or Approved. |
This section provides an overview of exception processing and discusses how to:
Reconcile claim details.
View incoming payments.
Using the Claim Reconciliation - Claim Details page you can handle exceptions that occur against claim reconciliation. You can change the Reconciliation Status on this page and the system will perform additional processing depending on what you change the status to. This table illustrates the exception processing that can occur when you change the reconciliation status:
Exception Process to Correct |
Current Reconciliation Status |
Changed to Reconciliation Status |
Additional System Processing |
Total Claim Collected amount against an adjustment voucher or against a pending item that was sent to PeopleSoft Receivables is less than the under tolerance amount or Total Claim Collected amount is greater than the over tolerance amount and the claims manager wants to stop further reconciliation processing. |
Exception |
Reconciled |
Once this status is changed the system will create an adjustment claim settlement entry to clear the residual amount and then depending on the settlement method will then generate an adjustment voucher in PeopleSoft Payables or a pending item in PeopleSoft Receivables. Plus, the claim status is changed from Partially Paid to Paid. |
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIM_RECON |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Claim Reconciliation, Claim Reconciliation - Claim Details |
View claim reconciliation details and maintain claim payment exceptions. |
|
VRBT_RECON_INPAY |
Click the Incoming Payments link on the Claim Reconciliation - Claim Details page. |
View incoming payments details associated with a vendor rebate claim. |
|
VCHR_INQ_PYMNT |
Click the AP Payment Reference (accounts payable payment reference) link next to a payment on the Claim Reconciliation - Incoming Payments page. |
View voucher payment details. |
|
ITEM_LIST |
Click the AR Payment Reference (accounts receivable payment reference) link next to a payment on the Claim Reconciliation - Incoming Payments page. |
View customer item payment details. |
Access the Claim Reconciliation - Claim Details page.
Header and Settlement Tolerances
Most of the fields that display in these sections are the same as those that appear on the Claim - Details page.
See Maintaining Claims.
Accounting Date |
The accounting date appears by default as the claim date. You can override it if you choose. Select another accounting date if you want to record all the subsequent transactions sent to PeopleSoft Payables or PeopleSoft Receivables with this accounting date. Overriding the accounting date is useful in the situation where the claim life cycle is long and spans multiple accounting periods. For example, assume that you generate a claim in a particular accounting period, but due to some disputes with the supplier, you can only make the decision to close outstanding remaining claim amounts in subsequent accounting periods (previous accounting period might already be closed). Overriding the accounting date gives you the ability to record the adjustment in the current accounting period. |
Claim Status |
Displays the current claim status. Statuses are: Open, Approved, Deferred, Pending Payment, Partially Paid, and Paid. |
Reconciliation Status |
The current reconciliation status appears. Statuses are: Exception, Pending, Reconciled, and To Be Reconciled. Change this status to handle claim payment exceptions. You can change the status from Exception to either Reconciled or To Be Reconciled. |
Amount Summary
Total Claim Amount |
Displays the total claim amount in the vendor rebate agreement currency. |
Total Claim Adjustment |
Displays the total claim adjustment amount in the vendor rebate agreement currency. Total Claim Adjustment = (Total Claim Amount – Original Claim Amount) |
Total Claim Collected |
Displays the total claim amount collected in the vendor rebate agreement currency. |
Total Claim VAT Amount (total claim value added tax amount) |
Displays the total claim VAT amount in the vendor rebate agreement currency. This field will only appear if you are using VAT. |
VAT Collected (value added tax collected) |
Displays the VAT amount collected in the vendor rebate agreement currency. This field will only appear if you are using VAT. |
Settlement
DateTime |
Displays the date and time when the settlement was created. |
Claim Lines
Claim Adjust |
Displays the claim adjustment amount for this claim and line in the vendor rebate agreement currency. Claim Adjust = (Claim Amount – Original Claim Amount) |
Additional Links
Incoming Payments |
Click this link to access the Claim Reconciliation - Incoming Payments page. Use this page to view the claim payment details that came from PeopleSoft Payables and PeopleSoft Receivables. |
Access the Claim Reconciliation - Incoming Payments page.
AP Payment Reference (account payables payment reference) |
Click this link to access the Voucher Inquiry page. Use this page to view all the details associated with this voucher. |
AR Payment Reference (account receivables payment reference) |
Click this link to access the Customer Item Inquiry page. Use this page to view all the details associated with this pending item payment. |
This section discusses how to notify settlement managers.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_NTFY_SM_RC |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Notify Settlement Manager, Notify Settle Mgr |
Initiate the Notify Settlement Manager process. |
Access the Notify Settle Mgr page.
Notification Option |
Select the notification option. Values are:
|
This section discusses how to view claim settlement information.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIM_SETTLE |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Claim Settlement Inquiry, Claim Settlement |
View information associated with a vendor rebate claim settlement. |
Access the Claim Settlement page.
Note. You can view the same information that appears on this page using the claims management workbench. This page is useful for those individuals that only need to inquire on the information associated with a claim and do not require update capability.
Details
From AR Payment (from accounts receivable payment) |
Indicates that the voucher has been created to account for the payment recorded in PeopleSoft Receivables. |
This section provides an overview of the manual entry of claim payments and discusses how to enter claim payments manually.
The Claim Incoming Payment component gives you the ability to manually record incoming claim payments from external systems. If you are not using PeopleSoft Payables or PeopleSoft Receivables to collect supplier's rebate claim payments then you would use this component to enter claim payments.
Note. This Claim Incoming Payment component should not be used if you are using PeopleSoft Receivables to collect supplier's rebate claim payments. In this case, PeopleSoft recommends you remove user access to this component.
Page Name |
Object Name |
Navigation |
Usage |
VRBT_CLAIM_INPAY |
Purchasing, Vendor Rebates, Vendor Rebate Claims, Claim Incoming Payment, Claim Incoming Pay |
Manual entry of a incoming claim payment. |
Access the Claim Incoming Pay page.
Header and Amount Summary
The fields in this section of the page are the same as those discussed on the Claim - Details page.
See Maintaining Claims.
Incoming Payments
Amount Collected |
The amount collected in the rebate agreement currency appears by default from the claim settlement. You can override the amount collected. |
VAT Collected (value added tax collected) |
The VAT amount collected in the rebate agreement currency appears by default from the claim settlement. You can override the VAT amount collected. |
Processing Flag |
Indicates whether the incoming transaction has been processed or not by the reconciliation process. When you manually enter a new claim payment, this flag is unchecked. |
AP Payment Reference (accounts payable payment reference) |
Enter the reference of the payables payment transaction from the payables legacy system. |
AR Payment Reference (accounts receivable payment reference) |
Enter the reference of the receivables payment transaction from the receivables legacy system. |
Save Payment |
Click this button to save the incoming claim payment. |