Entering Renewals

This chapter provides an overview of renewals and discusses how to:

Click to jump to parent topicUnderstanding Renewals

Contracts enables you to renew contract lines outside of amendment processing. A renewable contract line is for a fixed-amount product or service, such as maintenance, where you license the product for a set period of time and provide the customer with the option of extending the licensing period once the initial period expires.

When defining a fixed-amount product, you can designate that product as renewable, select the renewal action (manual versus automated renewal), and optionally select a default renewal plan template. When selecting a renewable product onto a contract line, define a start and end date for the contract line, and establish a future renewal plan. If you select a renewal plan template for a product, the system creates a renewal plan upon your saving of the contract line.

This flowchart illustrates the renewals process flow:

Renewal process flow

Click to jump to parent topicDefining Renewable Products, Templates, and Contract Lines

This section provides an overview of renewal actions, renewal plan templates, and renewable contract lines and lists the pages used to define renewable products, templates, and contract lines.

Click to jump to top of pageClick to jump to parent topicUnderstanding Renewal Actions, Renewal Plan Templates, and Renewable Contract Lines

You must designate a product as renewable when defining the product on a contract line in order to associate the product with a renewal plan. At that time you select the renewal action (manual versus automated), and you can optionally select a renewal plan template. You can designate only fixed amount products (those with amount or percent price types) as renewable.

This section discusses:

Renewal Actions

When defining a fixed amount product, you designate the product as renewable and select a renewal action of Manual or Automatic. You designate the renewal action on the Product Definition - Contracts Options page; however, you can override the renewal action when adding the product to a contract line on the Add Contract Lines page.

Manual

A manual renewal requires you to confirm with the customer before converting the renewal to a new sale. To process a renewal manually, click the Approve button on the Define Renewal Cycle page. Before processing renewals, you may want to click the Reprice button to ensure that you have the correct price.

Automatic

Automatic renewals enable you to take a previously successful sale of a renewal and convert it to a new sale without the need for customer confirmation. To have the system process a renewal automatically, click the Process Renewals button on the Review Renewals page or use the Process Renewals run control page.

Renewal Plan Templates

Renewal plan templates automate renewal processing through the creation of renewal plans and cycles and the assignment of contract lines to renewal cycles. When a renewal plan is created, the system assigns the first cycle to the original contract line. All renewed products are assigned to the next cycle upon approval of the previous cycles.

Create renewal plan templates on the Renewal Plan Template page.

Note. You can assign renewal templates to fixed-amount products only.

With renewal templates, you can:

Here are the rules for renewal templates:

Renewable Contract Lines

Select a renewable product for a contract line on the Add Contract Lines page. The setup steps for the contract line are the same as those for nonrenewable contract lines, with one exception: for renewable contract lines, you must enter a start date and an end date for the renewable contract line.

See Also

Setting Up Products and Product Groups

Defining Renewal Plan Templates

Click to jump to top of pageClick to jump to parent topicPages Used to Define Renewable Products, Templates, and Contract Lines

Page Name

Object Name

Navigation

Usage

Product Definition - Contracts Options

PROD_CONTRACTS

Products, Identify Product Details, Definition, Contracts Options

Define a product or service as renewable for use on your contract lines. You can optionally select a renewal plan template on this page.

See Establishing Product Contract Options.

Renewal Plan Template

CA_RNW_TEMPLATE

Set Up Financials/Supply Chain, Product Related, Contracts, Templates, Renewal Templates

Create renewal plan templates to use on your contract lines.

See Defining Renewal Plan Templates.

Hold Reason

CA_HOLD_RSN

Set Up Financials/Supply Chain, Product Related, Contracts, General Options, Hold Reason

Define hold reasons by setID to use when placing renewal cycles on hold.

Add Contract Lines

CA_OFFERING_SRCH

Customer Contracts, Create and Amend, General Information, Contract - Lines, Add Contract Lines

Select renewable products to add to your contract lines. Add products to contract lines, and specify which of those products are renewable.

See Defining Contract Lines.

Click to jump to parent topicDefining Renewal Plans and Renewal Cycles

This section provides an overview of renewal plans, renewal cycles, and renewal statuses, lists prerequisites and common elements, and discusses how to:

  1. Create renewal plans.

  2. Define renewal cycle parameters.

  3. View renewable contract line details.

Click to jump to top of pageClick to jump to parent topicUnderstanding Renewal Plans, Renewal Cycles, and Renewal Statuses

This section discusses:

Renewal Plans and Renewal Cycles

Renewal plans and renewal cycles are the main components of the renewal feature. A renewal plan contains one or more renewal cycles. Each cycle represents a period of time. You must define the product and amount corresponding to this period of time. When you assign renewable contract lines to a renewal cycle and approve the cycle, the system generates a new contract line.

A renewal cycle can comprise the following:

You can generate one or multiple contract lines from a single renewal plan. You can also assign multiple contract lines to one renewal cycle. If you do so, the resulting contract line represents a consolidated version of the original, renewed contract lines. For example, if your original contract has two separate lines for software upgrade (Payables upgrade and General Ledger upgrade), and you want to renew both lines but end up with only one new contract line named Financials Upgrade, assign both products to the same renewal cycle to obtain a consolidated contract line. If, instead, you choose to keep the products separated, assign each product to a separate renewal cycle to obtain a new contract line for each renewed product.

You can assign a contract line to the current cycle of an existing renewal plan or you can assign a contract line to the current cycle of a new renewal plan. When assigning a contract line to a new renewal plan, the system retrieves information by default from the contract line to the renewal plan and autogenerates the first renewal cycle based on the contract line parameters.

The renewal plan determines the contract number on which the renewal line is placed. A renewal plan can consist of multiple renewal cycles, enabling you to specify for each cycle a new product ID and amount. When you assign a contract line to a renewal plan, you always link to the current renewal cycle on that renewal plan.

The renewal cycle determines the start date, end date, product ID, and pricing for the new contract line created by the renewal process. You can define the details for a renewal cycle on the Define Renewal Plan page. However, you can only approve a renewal cycle on the Define Renewal Cycle page.

Additional pages in Contracts display view-only values pertaining to renewal lines:

Once you associate a contract line with a renewal plan cycle and approve the renewal cycle, the system sets the status of the contract line to Renewed. The system creates a new contract line based on the parameters established for the renewal plan and cycle with which you associated the contract line. The new contract line has its own accounting distributions and must be assigned to a revenue plan and billing plan.

Renewal Statuses

Status values exist at the renewal plan and renewal cycle levels. This diagram depicts the flow between the status values and the functionality related to the renewal plan cycle status:

Renewal plan and cycle status flows

Renewal plan status values are:

Pending

When you create a renewal plan, the system sets the status to Pending. The system does not edit-check Pending renewal plans when saved.

In Progress

The system sets the renewal plan to In Progress once you approve the first cycle.

Cancelled

You can close the renewal plan manually if you determine that the product or services associated with this renewal plan will not be renewed in the future, or if the product or services are to be assigned to a different renewal plan.

Renewal cycle status values are:

Pending

When you create a renewal plan, the system generates a renewal cycle for that renewal plan. Pending appears by default as the status. You can save your new renewal plan cycles without having to meet the edit-checking requirements that the system enforces on renewal plan cycles with a Ready status. You can only assign contract lines to cycles in Pending status.

Ready

Once you enter data into a renewal plan cycle and assign contract lines to it, you can manually change the status to Ready. The system edit-checks the data. To make changes to a renewal plan cycle in Ready status, reset the status back to Pending. Once you complete the changes, change the status back to Ready (at which point edit checking validates any updates). Once you save the page in Ready status, the Approve button appears.

Note. The Approve button is available for renewals with a renewal action of Manual only.

Done

The system updates the cycle status to Done when you click the Approve button. Clicking this button indicates that the products specific to the renewal plan cycle were accepted or approved by the customer for the renewal period. Upon completion of the cycle, the system sets the status of the original contract line to Renewed and generates a new, active line for the renewal period specified by the renewal cycle.

Click to jump to top of pageClick to jump to parent topicPrerequisite

Select a renewable product for a contract line with an Active, Pending, or Cancelled line status.

Click to jump to top of pageClick to jump to parent topicCommon Elements Used in This Section

Assign Renewable Contract Lines

Click to select renewable lines to assign to a renewal plan or renewal cycle.

Cycle in Progress

Corresponds to the cycle number in the Renewal Cycles grid on the Define Renewal Plan page and indicates which cycle is open for assignment. When assigning to a renewal plan, always assign to the cycle in progress.

Cycle Status

Controls which updates can be made to, and what processing can occur against, a renewal cycle. Pending appears by default as the cycle status upon creation of a new cycle. Only pending cycles can be assigned. After assigning a renewal cycle to the renewal plan, you can update the status to Ready.

When you save a renewal cycle to a cycle status of Ready, the system displays the Approve button.

Note. The Approve button is available for renewals with a renewal action of Manual only.

End Date (renewable lines)

Displays the end date for the original contract line.

End Date (renewal cycles)

Displays the end date for the cycle number. This becomes the end date on the contract line created from renewable products linked to this renewal cycle.

Gross Amount

Enter a gross amount for the renewal cycle if the associated price basis is User-entered Amount and the option to create one contract line for all renewable lines was selected for the cycle. The value in this field becomes the renewal amount on the new contract line generated by the renewals process.

Product ID

Select a renewable product. This becomes the product ID on the contract line created from the renewal plan cycle.

Select an amount- or percent-based product. If you select a percent-based product for the renewal line, the system sets the price type of the new line to Amount.

Note. The product on the renewal cycle may differ from the product on the renewable contract line.

Renewal Cycle

Displays a sequential renewal cycle number. Represents a period of time.

Renewal Plan

Displays a unique renewal plan ID. Contains one or more renewal cycles.

Start Date (renewable lines)

Displays the start date for the original contract line. If you have deferred revenue for this renewable line, the deferred revenue accounting date appears in this field. The deferred revenue accounting date appears by default from the product, and you must accept the default value. If this value is not correct, use amendment processing to change the start date.

Start Date (renewal cycles)

Displays the start date for the cycle number. This becomes the start date on the contract line created from renewable products linked to this renewal cycle. The start date must be at least one day after the end date of the renewable product.

Target Contract

Displays the contract on which the renewal plan creates the renewed contract line. The target contract number does not need to match the contract number of the contract line containing the renewable product that you are assigning to this renewal plan.

Click to jump to top of pageClick to jump to parent topicPages Used to Define Renewal Plans and Renewal Cycles

Page Name

Object Name

Navigation

Usage

Define Renewal Plan

CA_RNW_PKG_PNL

  • Customer Contracts, Define Renewals, Plan, Define Renewal Plan

  • Click the Create Plan button on the Renewals tab of the Contract - Lines page.

Create a new renewal plan or update an existing renewal plan if it has not been associated with a contract (that is, the status of the renewal plan is Pending).

Define Renewal Cycle

CA_RNW_CYCLE2_PNL

Customer Contracts, Define Renewals, Cycle, Define Renewal Cycle

Define the parameters for a renewal cycle and ready and approve the renewal cycle status. You can also view all contract lines associated with this renewal cycle.

Renewal Terms Notes

CA_RNW_TERMS_NOTES

Click the Terms and Conditions link on the Define Renewal Cycle page.

Enter internal contract notes for your renewal plan.

Renewable Line Detail

CA_RNW_LINE

Customer Contracts, Define Renewals, Contract Lines

Define and update the renewal details of a contract line. For percent-based contract lines, review and edit the list of contract lines to which this contract line applies—for example, a percent-based contract line for a warranty that originally applied to two contract line items, but is being renewed for a single contract line item.

Click to jump to top of pageClick to jump to parent topicCreating Renewal Plans

Access the Define Renewal Plan page.

Unit

Select the Contracts business unit to which this renewal plan applies.

Status

Displays the plan status, which controls what updates can be made to, and what processing can occur against, a renewal plan.

Revenue Plan Template

Select a revenue plan template to associate with this renewal plan. If you previously selected a revenue plan template on the associated renewal plan template, that revenue plan template displays. This field is optional.

Autoready Revenue Plan

Select to have the system automatically set the status of the associated revenue plan to Ready upon renewal cycle approval.

This field displays the value that was entered as a default on the renewal plan template for auto creation of the renewal plan and renewal cycle. You can override the default value here. If you select this check box, the system automatically set the status of the associated revenue plan to Ready upon renewal cycle approval. If you do not select this check box, the system creates the revenue plan in Pending status.

Note. This option applies only if you selected a revenue plan template.

Bill Plan Template

Select a bill plan template to associate with this renewal plan. If you previously selected a bill plan template on the associated renewal plan template, that revenue plan template displays. This field is optional.

Autoready Billing Plan

Select to have the system automatically set the status of the associated billing plan to Ready upon renewal cycle approval.

This field displays the value that was entered as a default on the renewal plan template for auto creation of the renewal plan and renewal cycle. You can override the default value here. If you select this check box, the system automatically set the status of the associated billing plan to Ready upon renewal cycle approval. If you do not select this check box, the system creates the billing plan in Pending status.

Note. This option applies only if you selected a billing plan template.

Detail Template

Select a billing plan detail template to associate with this renewal plan. If you previously selected a billing plan detail template on the associated renewal plan template, that revenue plan template displays. This field is optional.

Reprice

Click to have the system price all cycles with a status of Ready or Pending. If you have set up rules for Enterprise Pricer, the system calculates the price for the cycles. Otherwise, the system returns the list price.

The amount that Contracts passes to Enterprise Pricer is different based on the price basis option for the associated renewal cycle. Enterprise Pricer uses the amount passed from Contracts to calculate the new price.

Note. At least one renewable contract line must be linked to a renewal cycle in order to use the reprice functionality.

If the option to create one contract line for all renewable lines was selected for the renewal cycle and you select the Reprice button, the system reprices the current cycle only.

You cannot use the Reprice functionality if you selected the option to create one contract line for each renewable line for the renewal cycle.

Renewal Cycles

In the Renewal Cycles grid, define the products and product attributes specific to this renewal plan.

Cycle

Displays the system generated cycle number for each line that you add to a renewal plan. Click the cycle number to administer and approve details for the renewal cycle.

Quantity

Displays the quantity for the product on the contract line assigned to this renewal cycle if the associated renewal cycle status is Done. If the renewal cycle status is Pending or Ready, the target contract line does not yet exist and this field is available for entry.

UOM (unit of measure)

Displays the unit of measure for the product on the contract line assigned to this renewal cycle if the associated renewal cycle status is Done. If the renewal cycle status is Pending or Ready, the target contract line does not yet exist and this field is available for entry.

Gross Amount

Enter a gross amount for the renewal cycle if the associated price basis is User-entered Amount and the option to create one contract line for all renewable lines was selected for the cycle. The value in this field becomes the renewal amount on the new contract line generated by the renewals process.

Note. This field is blank and not available for entry if the option to create one contract line for each renewable line was selected for the cycle or if the price basis is any value other than User-entered Amount.

Assign Renewable Lines

Click to assign renewable lines to renewal plans.

Click to jump to top of pageClick to jump to parent topicDefining Renewal Cycle Parameters

Access the Define Renewal Cycle page.

Renewal Plan

Click to view and manage the details of all renewal cycles associated with the renewal plan.

Target Contract

Click to view and manage the header level details for this contract.

Create One Contract Line

Select a value to indicate how the renewals process generates new contract lines. Values include:

for all renewable lines

Select for the renewals process to generate one new contract line for one or multiple renewable contract lines that are linked to the same renewal cycle.

for each renewable line

Select for the renewals process to generate a new contract line for each renewable contract line that is linked to the renewal cycle.

Hold

Hold Cycle

Select to place the renewal cycle on hold. Selecting this check box enables you to enter a hold reason in the Reason field and the system populates the Date Held field with the current date.

Reason

Select a hold reason code for putting the renewal cycle on hold. This field is accessible only if you selected the Hold Cycle check box.

Date Held

Displays the date that the renewal cycle was put on hold. A value appears in this field only if you selected the Hold Cycle check box.

Product ID

If you selected the option to create one contract line for all renewable lines, this field is available for entry. The value selected for this field becomes the product ID on the new contract line generated by the renewals process.

Note. If you selected the option to create one contract line for each renewable line, this field is blank and not available for entry.

If you change the product ID and the product has a unit of measure (UOM) default associated with it, the system populates the Unit of Measure field with this value. If you change the product ID and the product does not have a UOM associated with it, no value appears in the Unit of Measure field.

Accounting Distribution Option

Appears by default from the value specified on the associated renewal plan template for automatic creation of renewal plans and cycles. For manual creation of renewal plans and cycles, Default appears by default in this field.

The renewals process uses the value in this field to determine whether to create the accounting distribution for the new contract line from the default or the source renewable contract line. You can accept the default value or override it here. Values include:

  • Default: Select to associate the accounting distribution for the new contract line with the default.

  • Inherit from Line: Select to associate the accounting distribution for the new contract line with the source renewable contract line.

Note. This field is available for entry if the option to create one contract line for all renewable lines was selected for the cycle and only one renewable line is linked to the renewal cycle. If the option to create one contract line for all renewable lines was selected and multiple renewable contract lines are linked to the renewal cycle, the system populates the value is this field with Default and the field is unavailable for entry. In addition, if the option for each renewable line, was selected for the cycle, the field is blank and unavailable for entry.

Quantity

Displays the quantity for the product. The value in this field defaults from the contract line quantity. If you want to specify a different quantity, enter a new value here.

Note. If you selected the option to create one contract line for each renewable line, this field is blank and not available for entry.

Renewal Action

Appears by default from the value specified on the associated contract line for automatic creation of renewal plans and cycles. For renewal plans and cycles not yet assigned to a contract line, Automatic appears by default in this field. Possible values include Automatic and Manual.

The renewal action drives the behavior of the renewal plan tied to the contract line. With automatic renewals, the system processes the renewal when the specified criteria is met.

Note. If you change the value in this field, the system updates the renewal action of the cycle and all renewable contract lines that are linked to the renewal cycle with the new renewal action that you selected.

Unit of Measure

Displays the default UOM of the renewable contract line. For manual renewals, you can override the default and enter a new value here. This field is available for entry or edit for manual renewals if you selected the option to create one contract line for all renewable lines.

Note. If you selected the option to create one contract line for each renewable line, this field is blank and not available for entry.

Price Basis

Appears by default from the value specified on the associated renewal plan template for automatic creation of renewal plans and cycles. For manual creation of renewal plans and cycles, Contract Line Gross Amount appears by default in this field. The renewals process and reprice functionality use the value in this field to determine the amount to pass to Enterprise Pricer as the base price to calculate the renewal price for the new contract line. You can accept or override the default value. Possible values include:

  • Contract Line Gross Amount: The system passes the contract line gross amount for each renewable contract line to Enterprise Pricer.

  • Contract Line List Price: The system passes the contract line list price for each renewable contract line to Enterprise Pricer.

  • Contract Line Net Amount:The system passes the contract line net amount for each renewable contract line to Enterprise Pricer.

  • Then Current List Price: The system does not pass any amount to Enterprise Pricer.

    The system uses the list price in Enterprise Pricer or the product's list price based on the start date of the cycle.

  • User-entered Amount: The system passes the gross amount to Enterprise Pricer if you selected the option to create one contract line for all renewable lines.

    However, if you selected the option to create one contract line for each renewable line, the system passes the target gross amount on the grid for each renewable contract line to Enterprise Pricer.

Approve

Click to have the system update the status of the renewal cycle from Ready to Done. The system calls the Renewals Process to create the new renewable contract line as well as the accounting distributions, billing plan, and revenue plan for the new contract line. The process is same as that for the Process Renewals page, but the process is run only for the renewal cycle and associated renewable contract line selected on this page.

Note. This field does not appear on the page until the cycle is in Ready status. This field appears for renewal cycles with a renewal action of Manual only.

Billing and revenue plans are created only if a billing plan template and revenue plan template were specified for the renewal plan or product.

Reprice

Click to reprice the cycle. When clicking this button, the system passes all price-by fields to Enterprise Pricer to retrieve the current price. The amount passed to Enterprise Pricer varies based on the price basis option for the associated renewal cycle. Enterprise Pricer uses the amount passed from Contracts to calculate the new price.

Note. At least one renewable contract line must be linked a renewal cycle in order to use the reprice functionality.

Price Rules Maintenance

Click to access the Price Rules Maintenance page in Enterprise Pricer to identify conditions and formulas that must be met to apply pricing.

Click to access the Price Rules Maintenance page in Enterprise Pricer to identify conditions and formulas that define what price the system will assign.

Terms and Conditions

Click to access the Renewal Terms Notes page, where you can enter terms for your renewal cycle.

Renewable Lines - General Tab

Contract

Displays the contract number of the contract line assigned to this renewal cycle. This contract number may not match the target contract number, depending upon whether you want to create the renewal line on the original contract or create the renewal line on a new contract.

Line

Displays the contract line number assigned to this renewal cycle.

Product

Displays the product on the contract line assigned to this renewal cycle. This product may not match the product that you previously specified, depending upon whether you want to create a renewal line with the existing product ID or create a renewal line with a new product. Click a product to access the Renewable Line Detail page, where you can review the details for this contract line.

Quantity

Displays the quantity for the product on the contract line assigned to this renewal cycle.

Unit of Measure

Enter a unit of measure if you selected the option to create one contract line for each renewable line for the cycle.

Note. If you selected the option to create one contract line for all renewable lines, this field is blank and not available for entry.

Gross Amount

Displays the contract line gross amount. This enables you to compare the original contract line gross amount to the gross amount specified for the renewal cycle.

Renewable Lines - Target Tab

Select the Target tab.

Target Product ID

Appears by default from the value in the Product ID field in the grid if the option to create one contract line for each renewable line was selected for the cycle. The value in this field becomes the product ID on the new contract line generated by the renewals process.

Note. This field is blank and not available for entry if the option to create one contract line for all renewable lines was selected for the cycle.

If you change the associated product and the new product has a unit of measure (UOM) default associated with it, the system populates the Unit of Measure field in the grid with this value. If you change the product ID and the product does not have a UOM associated with it, no value appears in the Unit of Measure field in the grid.

Target Quantity

Displays the target quantity for the target product on the contract line assigned to this renewal cycle.

Note. If you change the value in this field, click the Reprice button for the system to update the value in the Target Gross Amount field.

Target UOM

Displays the target unit of measure if you selected the option to create one contract line for each renewable line for the cycle.

Target Gross Amount

Appears by default from the value in the Gross Amount field if the option to create one contract line for each renewable line was selected for the cycle.

Note. This field is unavailable for entry if the option to create one contract line for each renewable line was selected for the cycle, but the price basis is any value other than User-entered Amount. This field is blank and not available for entry if the option to create one contract line for all renewable lines was selected for the cycle.

Accounting Distribution Option

Select the accounting distribution option for the renewals process to use to determine whether to create the accounting distribution for the new contract line comes from the default or the source renewable contract line. Values include:

  • Default: Select to associate the accounting distribution for the new contract line with the default.

  • Inherit from Line: Select to associate the accounting distribution for the new contract line with the source renewable contract line.

Note. This field is available for entry if the option to create one contract line for each renewable line was selected for the cycle. This field is blank and unavailable for entry if the option to create one contract line for all renewable lines was selected for the cycle.

Click to jump to top of pageClick to jump to parent topicViewing Renewable Contract Line Details

Access the Renewable Line Detail page.

Basis Line # (basis line number)

For percent-based renewable products, select the contract lines to which the renewable product applies. For example, you might renew a contract line that originally provided a warranty for two contract lines, but the renewed warranty applies to a single contract line.

Amount

Displays the gross amount for the selected basis line number.

Click to jump to parent topicAssigning Contract Lines to Renewal Plans

This section discusses how to assign renewable contract lines to renewal plans.

See Also

Defining Contract Lines

Click to jump to top of pageClick to jump to parent topicPage Used to Assign Contract Lines to Renewal Plans

Page Name

Object Name

Navigation

Usage

Assign Cycles

CA_RNW_MGMT

  • Customer Contracts, Define Renewals, Assign Cycles

  • Click the Assign Renewable Lines link on the Define Renewal Plan page.

Assign renewable contract lines to renewal plans.

Click to jump to top of pageClick to jump to parent topicAssigning Renewable Contract Lines to Renewal Plans

Access the Assign Cycles page.

When assigning renewable contract lines to a renewal plan, you can assign one or multiple renewal contract lines to one cycle in that renewal plan.

Selection Criteria for Renewable Lines

If you accessed this page by clicking a link on the Contract - General, Contract - Lines, or Define Renewal Plan pages, the system populates these fields based on the information on the precursory page.

Filter search results by Contracts business unit, sold to customer, contract, or renewal period end date. If you leave all fields cleared, the search retrieves all active, pending, and cancelled renewable contract lines matching the selected renewal assignment status in your system.

Renewal Assignment Status

Enables you to filter search results by the following criteria:

Both Assigned and Not Assigned: Search results include renewable lines not assigned to a renewal cycle and renewable lines assigned to a renewal cycle that is in Pending or Ready status.

Note. You can reassign only contract lines that are currently assigned to a cycle in Pending status.

Assigned: Search results include only renewable contract lines that have been assigned to a renewal cycle, and the cycle status is Pending or Ready.

Not Assigned: Search results include only renewable contract lines that have not been assigned to a renewal cycle.

Search

Click to search for renewable contract lines based on the entered criteria.

Select Lines to Assign to Renewal Plan - General Tab

The system creates a line in the search results scroll area for each contract line that matches your search criteria.

Select

Select the check box in this column for the contract lines that you want to assign to a particular renewal plan. You can select a contract line that is already assigned to a renewal plan; when you click Assign, the contract line is unassigned from the existing plan and then assigned to the value that you select in the Renewal Plan field.

Contract

Click the contract number for a contract line to transfer to the Contract - General page for that contract.

Line

Displays the contract line number.

Amount

Displays the gross amount for this contract line.

Renewal Action

Displays the renewal action of the renewable contract line. Values include Manual and Automatic. This field is display-only.

Select Lines to Assign to Renewal Plan - Additional Info Tab

Select the Additional Info tab.

Source Renewal

Displays the source renewal plan number, if the system created a contract line as part of a renewal cycle. If you created the contract line during contract entry, the system clears this field.

Target Renewal

Displays the renewal plan under which this line is set to be renewed.

For contract lines assigned to a renewal plan, the renewal plan number appears. If you have not assigned the contract line to a renewal plan, the system clears this field.

Cycle

Click this number to view the cycle details. If you have not assigned the contract line to a renewal plan, this field is blank.

Status

Displays the renewal cycle status if the contract line is currently assigned to a renewal plan and cycle.

Renewal Plan to Assign/Unassign

Use the fields in the Renewal Plan to Assign/Unassign region to assign the renewable contract lines that you selected in the Select Lines to Assign to Renewal Plan scroll area to an existing renewal plan or a new plan, or to remove them from a renewal plan to which they were assigned.

Renewal Plan

Link contract lines to an existing renewal plan, or select NEXT to link the selected lines to a new renewal plan.

Cycle

Displays the current cycle for the renewal plan, if you are assigning an existing renewal plan.

Start Dt (start date)

Displays the start date for the cycle of the renewal plan that you are assigning, if you are assigning an existing renewal plan.

Renewal Action

Displays the renewal action of the renewal cycle. Values include Manual and Automatic. This field is display-only.

Unit

Enter a contracts business unit, if you are assigning a new renewal plan.

Target Contract

Enter a target contract, if you are assigning a new renewal plan.

Assign

Click to assign contract lines to the selected renewal plan. The system assigns the renewable contract line to the current cycle of a new renewal plan or to the current cycle of an existing renewal plan.

Note. If the renewal action of the selected renewable contract line is different from the renewal action of the renewal cycle, the system warns you that the renewal action of the renewable contract line will be changed to the renewal action of the renewal cycle.

Unassign

Click to remove contract lines from a renewal plan to which they were previously assigned.

Click to jump to parent topicPricing Renewal Plans

This section provides and overview of renewal pricing and lists the pages used to price renewal plans. Here are the steps required to set up Enterprise Pricer for renewals pricing:

  1. Set up price list (optional).

  2. Set up price rules.

  3. Set up arbitration plan.

  4. Select price basis option.

Click to jump to top of pageClick to jump to parent topicUnderstanding Renewal Pricing

You can price renewals with or without Enterprise Pricer. With Enterprise Pricer rules set up for your system, you have additional pricing flexibility. Without Enterprise Pricer, Contracts uses the list price of the product for pricing.

If you have set up rules for Enterprise Pricer, renewal pricing enables you to specify the price basis and percent increase or decrease for the renewal cycle to calculate the renewal amount. You specify the price basis on the Define Renewal Cycle page. A link on the Renewals Cycle page takes you to the Price Rules Maintenance page in Enterprise Pricer where you can enter the percent increase or decrease field. The Renewals process uses the price returned from the Enterprise Pricer as the renewal amount for the new contract line. If you do not have rules for Enterprise Pricer set up for your system, the Renewals process uses the list price as the renewal amount for the new contract line.

The renewal price can be based on one of the following price basis:

For pricing renewals, additional Enterprise Pricer setup may be required. If you want to use the price increase or decrease option, you must setup the Price Rule and Arbitration Plan in Enterprise Pricer for pricing to function correctly. If you select Then Current List Price for the price basis on the Define Renewal Cycle page, you have the option to setup the Price List in Enterprise Pricer. If you do not set up the Price List in Enterprise Pricer, the system uses the list price defined for the product as the base price.

When pricing manual renewals by clicking the Reprice button on the Define Renewal Cycle page, Contracts passes the renewal plan, cycle number, product, and renewal start date to Enterprise Pricer. The amount passed to Enterprise Pricer differs for the different price basis options:

Note. You must click the Reprice button on the Define Renewal Cycle page to price the renewable contract lines before running the manual Renewals process (click the Approve button on the Define Renewal Cycle page).

The automatic renewals process passes the same parameters when calling to Enterprise Pricer as the manual process discussed above.

Enterprise Pricer Pricing Elements

Enterprise Pricer consists of pricing elements that you use to create your pricing structure:

Price Lists

These enable you to select products and conditions where the price list applies to a transaction. During a transaction, the system either determines the product price based on your predefined search hierarchy for the transaction or the product's lowest price on any associated active price lists. This price is used as the basis for any further discounts and surcharges.

Price Rules

These define the conditions that must be met in order for the adjustments to be applied to the base price. Multiple rules can apply when conditions of each rule are met.

Warning! When setting up price rules for Enterprise Pricer, select the Line option in the Rollup By field in the Rules Attributes section of the Formulas page. Contracts supports this Line option only.

Arbitration Plans

These define how the price rules are to be applied to the base price when the transaction is priced.

See PeopleSoft Enterprise Pricer.

See Understanding Enterprise Pricer.

Price Basis for Enterprise Pricer

Contracts price-by fields include: business unit, contract number, contract type, region code, sold to customer ID, address sequence number, product group, renewal plan, renewal plan cycle, ship to customer ID, and contract sign date. In addition, if you select the for each renewable contract line option, Contracts passes the TARGET_PRODUCT_ID of the renewable line. If you select the for all renewable lines option, Contracts passes the PRODUCT_ID of the renewal cycle.

The following table shows the information that passes back and forth between Contracts and Enterprise Pricer based on the price basis:

Price Basis

Information Flow Between Contracts and Enterprise Pricer

Contract Line Gross Amount

  1. Contracts passes all Contracts price-by fields, renewal cycle start date, previous contract line start date, quantity, and contract line gross amount for each renewable contract line to Enterprise Pricer.

  2. Enterprise Pricer uses the contract line gross amount as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

  3. Enterprise Pricer returns the calculated price for each renewable contract line to Contracts.

    • If you selected the for each renewable line option, on the Define Renewal Cycle page, the system overwrites the Target Gross Amount on the grid with the calculated price. The calculated price becomes the renewal amount of the new contract line. The Target Gross Amountfield on the grid is no longer accessible.

    • If you selected the for all renewable lines option on the Define Renewal Cycle page, the system overwrites the Gross Amount on the grid with the sum of the calculated price. The calculated price becomes the renewal amount of the new contract line. The Gross Amount field is no longer accessible.

    • If you are renewing multiple contract lines together to create a single contract and the start and end dates for the contract lines that are being renewed are different, the Enterprise Pricer returns the same amount that Contracts passed to the Enterprise Pricer back to Contracts.

Contract Line Net Amount

  1. Contracts passes all Contracts price-by fields, renewal cycle start date, previous contract line start date, quantity, and contract line net amount for each renewable contract line to Enterprise Pricer.

  2. Enterprise Pricer uses the contract line net amount as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

  3. Same as Step 3 for Contract Line Gross Amount.

Contract Line List Price

  1. Contracts passes all Contracts price-by fields, renewal cycle start date, previous contract line start date, quantity, and contract line list price for each renewable contract line to Enterprise Pricer.

  2. Enterprise Pricer uses the contract line list price as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

  3. Same as Step 3 for Contract Line Gross Amount.

Then Current List Price

  1. Contracts passes all Contracts price-by fields, renewal cycle start date, quantity, and previous contract line start date for each renewable contract line to Enterprise Pricer.

  2. If you defined the list price for the product in Enterprise Pricer, Enterprise Pricer uses the Enterprise Pricer list price based on the start date of the cycle as the base price. If you did not define the List Price in Enterprise Pricer, the system uses the product's list price based on the start date of the cycle as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

  3. Same as Step 3 for Contract Line Gross Amount.

User-entered Amount

  1. If you selected the for all renewable lines option on the Define Renewal Cycle page:

    • Contracts passes all Contracts price-by fields, renewal cycle start date, previous contract line start date, quantity, and user-entered amount for each renewable contract line to Enterprise Pricer.

    • Enterprise Pricer uses the user-entered gross amount as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

    • Enterprise Pricer returns the calculated price for each renewable contract line to contracts.

      The system overwrites the Gross Amount with the calculated price. The calculated price becomes the renewal amount of the new contract line. The Gross Amount field is accessible.

    • If you are renewing multiple contract lines together to create a single contract and the start and end dates for the contract lines that are being renewed are different, the Enterprise Pricer returns the same amount that Contracts passed to the Enterprise Pricer back to Contracts.

  2. If you selected the for each renewable line option on the Define Renewal Cycle page:

    • Contracts passes all Contracts price-by fields, renewal cycle start date, Previous Contract Line Start Date, and the Target Gross Amount in the grid on the Define Renewal Cycle page for each renewable contract line to Enterprise Pricer.

    • Enterprise Pricer uses the Target Gross Amount as the base price. Enterprise Pricer uses the base price, price rule, and arbitration plan to calculate the price for the renewal amount for the new contract line.

    • Enterprise Pricer returns the calculated price for each renewable contract line to contracts.

      The system overwrites the Target Gross Amount on the grid with the calculated price. The calculated price becomes the renewal amount of the new contract line. The Target Gross Amount field on the grid is accessible.

Note. If you do not set up the price rule and arbitration plan in Enterprise Pricer, Step 2 in the table above does not occur. Instead, Enterprise Pricer returns the same amount for each renewable contract line that Contracts passed to Enterprise Pricer back to Contracts.

Click to jump to top of pageClick to jump to parent topicPages Used to Price Renewal Plans

Page Name

Object Name

Navigation

Usage

Price List

EOEP_PRICE_LIST

Pricing Configuration, Create Pricing Information, Price List Maintenance

Define a price list. You can set up price lists in multiple currencies and create start and end dates for each product's price.

Set up this page if you want to use list price in Enterprise Pricer instead of the product's list price.

See Setting Up Price Lists.

Price Rules Maintenance - Conditions

EOEP_CONDITION

Pricing Configuration, Create Pricing Information, Price Rules Maintenance, Conditions

Select the price-by fields, values for the price-by fields, and the operator that determines how the price-by fields are related to the transaction.

See Setting Up Price Rule Conditions.

Price Rules Maintenance - Formulas

EOEP_FORMULA

Pricing Configuration, Create Pricing Information, Price Rules Maintenance, Formulas

Define the actions that take place when the price rule conditions are met.

See Setting Up Price Rule Formulas.

Arbitration Plan

EOEP_ARB_PLAN

Pricing Configuration, Create Pricing Information, Arbitration Plan

Define how price rules apply to the base or list price when pricing a transaction.

See Setting Up an Arbitration Plan.

Renewal Cycle

CA_RNW_CYCLE2_PNL

Customer Contracts, Define Renewals, Cycle, Define Renewal Cycle

Select the price basis option.

See Defining Renewal Cycle Parameters.

Click to jump to parent topicReviewing Renewals

This section provides an overview of renewal management and discusses how to review renewal plans.

Click to jump to top of pageClick to jump to parent topicUnderstanding Renewal Management

You can display and modify all renewable contract lines within Contracts by navigating to the Review Renewals page. This page displays all renewable contract lines from active contracts where the renewable contract lines end dates are equal to or before the timing defined. The pages does not include any contract lines that have already been renewed.

Actions that you can perform on the Review Renewals page include:

Click to jump to top of pageClick to jump to parent topicPage Used to Review Renewals

Page Name

Object Name

Navigation

Usage

Review Renewals

CA_REVIEW_RENEWALS

Customer Contracts, Define Renewals, Review Renewals

View and modify renewable contract lines from active contracts where the end dates of the renewable contract lines are equal or prior to the timing that you define. You can change the renewal action, change start and end dates of upcoming renewal periods, initiate the processing for automatic renewals, and place renewals on hold from this page.

Click to jump to top of pageClick to jump to parent topicReviewing Renewal Plans

Access the Review Renewals page.

Search Criteria

Use the fields in the Search Criteria group box to filter your search results by entering specific values in these fields. If you leave all fields blank, the search returns all renewable contract lines from active contracts within your system. Results appear in the Renewable Lines scroll area.

You can view and modify all renewable contract lines from active contracts where the end dates of the renewable contract lines are equal or prior to the timing that you define. The page does not display any contract lines that have already been renewed.

Days Before End Date

Enter a value to have the system retrieve all renewable contract lines with an end date less than or equal to the current date plus the number of days that you enter here. If you leave this field blank, the system retrieves all renewable contract lines with an end date less than or equal to the current date.

Contract Line Status

Select a contract line status of Active, Cancelled, Pending, or All to filter your search results. If you leave this field blank, the system retrieves all renewable contract from active contracts.

Renewal Action

Select a renewal action of Manual, Automatic, or All to filter your search results. If you leave this field blank, the system retrieves all renewable contract lines with all renewal actions from active contracts.

Renewal Option

Select a renewal option of Renew, Not to be renewed, or All to filter your search results. If you leave this field blank, the system retrieves all renewable contract lines with all renewal options from active contracts.

Hold Cycle Status

Select a hold cycle status of Hold, Not on hold, or All to filter your search results. If you leave this field blank, the system retrieves all renewable contract lines with all hold cycle statuses from active contracts. If you select Hold, the system retrieves all renewable contract lines linked to the renewal cycle that has been placed on hold.

Renewable Lines

(select)

Select the check box next to a renewable contract line to signify that you want to include this contract line in renewal processing. Processing occurs when you click the Process Renewals button.

Contract

Displays the contract number. This field is display-only.

Line

Displays the contract line number. This field is display-only.

Line Status

Displays the contract line status. This field is display-only.

Product

Displays the product ID of the renewable contract line. This field is display-only.

Gross Amount

Displays the gross amount of the renewable contract line. This field is display-only.

Start Date

Displays the start date of the renewable contract line. You can change the start date if the system date is not within the start and end dates of the renewable contract line. However, if the system date is within the start and end dates of the renewable contract line, you cannot change this date.

End Date

Displays the end date of the renewable contract line. You can change the end date if the system date is not within the start and end dates of the renewable contract line. However, if the system date is within the start and end dates of the renewable contract line, you cannot change this date.

Not to be Renewed

Select this check box to indicate that the renewable contract line is not to be renewed. If you select this check box and the contract line is already linked to a renewal cycle, the system unassigns the line from the cycle. The Renewals Process does not process any contract lines for which this check box selected.

Renewal Action

Select a renewal action or accept the default value. Possible values include: Automatic and Manual. If you change the value in this field for a renewable contract line that is linked to a renewal cycle with a different renewal action, the system unassigns the renewable contract line from the renewal cycle.

Review Timing Days

Enter a value for the review timing. The number of days that you can enter in this field depends on the option that you specified for the Review Timing field on the Contracts Definition - Processing Options page. If you selected Control on the Contracts Definition - Processing Options page, you cannot enter a value here that is less than the review timing specified for the Contracts business unit. If you selected Default on the Contracts Definition - Processing Options page, you can enter any value in this field.

Renewal Plan/Cycle

Click to access the Define Renewal Cycle page for the renewable contract line.

Hold Cycle

Indicates whether or not the renewal cycle is on hold. This field is display-only.

Hold Reason

Displays the reason that the cycle was placed on hold. This field is display-only.

Process Renewals

Click to initiate the Renewals process for renewals with an Automatic renewal action.

Note. If multiple renewable contract lines are linked to the renewal cycle, you must select all lines linked to that cycle for renewal processing. In addition, you cannot select any renewable contract lines that are not linked to a renewal cycle, that are marked Not to be Renewed, or that have a renewal action of Manual.

Click to jump to parent topicProcessing Renewals

This section provides an overview of renewal processing and discusses how to run the Renewals process.

Click to jump to top of pageClick to jump to parent topicUnderstanding Renewal Processing

The Renewals Application Engine (CA_RNW_PRCS) process creates the new renewable contract line, accounting distributions for the new contract line, billing plan, and revenue plan for the new contract line. After the system renews all contract lines and if there is at least one billing plan with a Ready status associated to the new contract line, the Renewals process schedules the Contracts Billing Interface (CA_BI_INTFC) process. After the Renewals process completes successfully, the system changes the renewal cycle status to Done on the Define Renewal Cycle page.

You can process renewals manually or have the system process them automatically. You can initiate the Renewals process from three locations:

Renewals Process Flow

Here are the steps that the system performs when processing renewals:

  1. Retrieves all eligible renewable contract lines:

  2. Updates the cycle status for all the renewal cycles to which the renewable contract lines are attached. If the cycle status is Pending, the system sets the cycle status to Ready.

    Note. This step applies to Automatic renewals only.

  3. Updates the status of all the renewal plans to which the cycle is attached to In Progress.

  4. Calls Enterprise Pricer to obtain the price for the new contract line. The system passes all Contracts price-by fields as well as the renewal cycle start date to Enterprise Pricer. The amount passed to Enterprise Pricer differs based on the price basis options.

    Note. This step applies to Automatic renewals only.

  5. Creates new renewable contract lines:

  6. Updates the source renewable contract line status to Renewed.

  7. Assigns the next cycle to the new contract line that the system created. This step occurs only if more cycles are defined for the renewal plan.

  8. Creates the accounting distribution for the new contract lines:

    The renewals process uses the value in the Accounting Distribution Option field on the Define Renewal Cycle page to determine whether to create the accounting distribution for the new contract line from the default or the source renewable contract line:

  9. Calls the ChartField combination editing process to validate all accounting distributions.

  10. If a billing plan template is defined on the run control (when the process is initiated from the Process Renewals run control page), the Renewals process uses this template to create the billing plan.

    Otherwise, the Renewals process uses the billing plan template defined for the renewal plan. If no billing plan template is defined for the renewal plan, the system uses the billing plan template defined for the product to create the billing plan. When the process is initiated from the Review Renewals page or Define Renewal Cycle page, if a billing plan template is defined for the renewal plan, the Renewals process uses this template to create the billing plan.

    If the Autoready Billing Plan option is selected for the renewal plan, the Renewals process creates the billing plan with a Ready status for the new contract line. Otherwise, the process creates the billing plan with a Pending status for the new contract line.

  11. If a revenue plan template is defined on the run control (when the process is initiated from the Process Renewals run control page), the Renewals process uses this template to create the revenue plan.

    Otherwise, the Renewals process uses the revenue plan template defined for the renewal plan. If no revenue plan template is defined for the renewal plan, the system uses the revenue plan template defined for the product to create the revenue plan. When the process is initiated from the Review Renewals page or Define Renewal Cycle page, if a revenue plan template is defined for the renewal plan, the Renewals process uses this template to create the revenue plan.

    If the Autoready Revenue Plan option is selected for the renewal plan, the renewals process creates revenue plan with a Ready status for the new contract line. Otherwise, the process creates a revenue plan with a Pending status for the new contract line.

  12. If a billing plan detail template override is defined on the run control (when the process is initiated from the Process Renewals run control page), the Renewals process uses this template for the billing overrides in the billing plan.

    Otherwise, the Renewals process uses the billing plan detail template ID defined for the renewal plan. If no billing plan detail template is defined for the renewal plan, the system uses the billing plan detail template defined for the product for the billing overrides in the billing plan. When the process is initiated from the Review Renewals page or Define Renewal Cycle page, if a billing plan detail template ID override is defined for the renewal plan, the Renewals process uses this template for the billing overrides in the billing plan.

  13. Sets the renewal cycle status to Done.

  14. If the Process Billing streamlining option is selected on the run control (when the process is initiated from the Process Renewals run control page) and there is at least one billing plan with a Ready status associated with the new contract line, the Renewals process schedules the Contracts Billing Interface (CA_BI_INTFC) through the Process Scheduler after all contract lines are renewed.

    When the process is initiated from the Review Renewals page or Define Renewal Cycle page, if there is at least one billing plan with a Ready status associated with the new contract line, the Renewals process schedules the Contracts Billing Interface (CA_BI_INTFC) through the Process Scheduler after all contract lines are renewed.

    Note. When the Contracts Billing Interface (CA_BI_INTFC) is scheduled by the Renewals process, only the billing plans for the newly created contract lines are processed.

Click to jump to top of pageClick to jump to parent topicPage Used to Process Renewals

Page Name

Object Name

Navigation

Usage

Process Renewals

RUN_CA_RENEWALS

Customer Contracts, Schedule and Process Renewals, Process Renewals

Initiate the Renewals Process for automatic renewals.

Click to jump to top of pageClick to jump to parent topicRunning the Renewals Process

Access the Process Renewals run control page.

Note. You can process only renewals with a renewal action of Automatic from this page. You process renewals with a renewal action of Manual from the Define Renewal Cycle page.

Contract Options

Use the fields in this group box to limit the renewals data that is included in the run of this process. Filter by Contracts business unit, contract type, sold to customer, or contract number. If you leave all fields blank, the process picks up all available renewals activity in Contracts.

Billing Option

Event Date

Select an event date to run the Renewals process for a specific billing event date. The system populates this field by default with the current date. The system uses this field to determine the billing plan events to pick up when running the Contracts Billing Interface (CA_BI_INTFC).

Renewals Options

Use the fields in this group box to limit the renewals data that is included in the run of this process. If you leave all fields blank, the process picks up all available renewals activity in Contracts.

Renewal Plan

Select a renewal plan to run the Renewals process for a specific renewal plan. The fields in the Contract Options group box are based on the target contract defined in the renewal plan.

Cycle

Displays the current cycle of the selected renewal plan.

Renewal Timing

Specify the number of days for the renewal timing or leave this field blank. If you leave this field blank, the system processes all renewable contract lines that are linked to the renewal cycle and have a start date less than or equal to the current date. If you enter a value in this field, the system processes all renewable contract lines that are linked to the renewal cycle with a start date less than or equal to the current date plus the specified number of days that you entered here.

Override Templates

Revenue Plan

Select this check box to override any previously defined revenue plan template for the renewal plan. If you select this check box, the Renewals process uses the revenue plan template that you specify in the Revenue Plan Template field on this page to create the revenue plan for the new contract line.

Revenue Plan Template

Select a revenue plan template for the Renewals process to use to create the revenue plan for the new contract line.

The revenue plan template that you define here overrides any previously defined revenue plan template for the renewal plan. If you do not select a revenue plan template here, the Renewals process uses the revenue plan template previously defined for the renewal plan to create the revenue plan. If no revenue plan template was previously specified for the renewal plan and you do not select one here, the Renewals process uses the revenue plan template defined for the product to create the revenue plan for the new contract line.

Billing Plan

Select this check box to override any previously defined billing plan template for the renewal plan. If you select this check box, the Renewals process uses the billing plan template that you specify in the Billing Plan Template field on this page to create the billing plan for the new contract line.

Billing Plan Template

Select a billing plan template for the Renewals process to use to create the billing plan for the new contract line.

The billing plan template that you define here overrides any previously defined billing plan template for the renewal plan. If you do not select a billing plan template here, the Renewals process uses the billing plan template previously defined for the renewal plan to create the billing plan. If no billing plan template was previously specified for the renewal plan and you do not select one here, the Renewals process uses the billing plan template defined for the product to create a billing plan for the new contract line.

Bill Plan Detail

Select this check box to override any previously defined billing plan detail template for the renewal plan. If you select this check box, the Renewals process uses the billing plan detail template that you specify in the Billing Plan Detail Template field on this page to define the billing overrides in the billing plan for the new contract line.

Bill Plan Detail Template ID

Select a billing plan detail template ID. The Renewals process uses the values defined in this template for the Billing Overrides in the billing plan for the new contract line.

The billing plan detail template that you define here overrides any previously defined billing plan detail template for the renewal plan. If you do not select a billing plan detail template here, the Renewals process uses the billing detail plan template previously defined for the renewal plan to define the billing overrides in the billing plan. If no billing plan detail template was previously specified for the renewal plan and you do not select one here, the Renewals process uses the billing plan detail template defined for the product for the new contract line.

Streamline Processing Option

Process Billing

Select to have the Renewals process call the streamline billing process for renewals. If you select this check box and there is at least one billing plan with a Ready status associated to the new contract line, the Renewals process will schedule the Contracts to Billing Interface (CA_BI_INTFC) process after all the contract lines are renewed.